SIS Grass Hybrid pitch renovation at St George’s Park

The first SIS Grass field was installed in June 2015 at St George’s Park.

After nearly 12 months, this pitch was the first to receive a full annual renovation, and we were keen to see how the SIS Grass Hybrid fibers stood up to the renovation process.

With the assistance of Premier Pitches, the pitch surface was Koro’d off successfully leaving a clean surface with only the SIS Grass Hybrid fibers being left standing up. There was no damage caused to the SIS Grass Hybrid fibers and no displacement of fibers from the rootzone which was extremely pleasing.

Roughly around 40 tonnes of sand was applied to the surface as a top dressing before some aeration with a Vert-Drain and then finally over seeded.

Since this renovation the game field at Chelsea’ Academy and training pitches for Hull City FC have also been renovated successfully.

Share:

Hybrid Grass Fields

Get in touch with our expert hybrid grass team for advice on your sports surfaces!

Contact Us