English
Türkiye
USA
Last year SIS Pitches completed the full construction of Ta’Qali National Stadium field and installation of SIS Grass Hybrid – the latest hybrid grass system. The stadium has already hosted the 2018 World Football Cup European qualifying match Malta vs Scotland in September 2016.
The project team, led by Carlos Reis, Operations Director, constructed the field in 22 days. The existing field was removed to a depth of 100cm, new drains were installed along with a new automatic irrigation system.
Afterward, the SIS Grass Hybrid machine with its patented fiber injection technology, transformed the stadium’s field to create a 95% natural surface. We have sourced the best yarns and developed unrivaled technology to create a hybrid surface that delivers a field capable of much longer playing hours than 100% natural grass surfaces, plus the robustness and endurance normally associated with synthetic turf.
After consultation with world leaders in design and construction of hybrid fields, the Malta FA awarded the contract to SIS Pitches who are well known for this type of technology. The works comprised of the removal of field profile to drainage level, the supply and installation of a new drainage system including a gravel layer, an irrigation system followed by sand and root zone layer as well as installation of SIS Grass Hybrid and grow-in maintenance.The standard of service received from appointment through to completion was to a high professional standard. The quality of construction was delivered to the highest standards with the project being delivered on schedule, within the agreed budget and to the satisfaction of players.
Emanuel Cassar, Director Business Development at Malta FA
Share:
To learn more about our synthetic, hybrid and natural sports surfaces, contact our team for a free consultation.
Trustpilot