
SIS Pitches reveals ambitious plans in Saudi Arabia
The team behind the World Record-breaking Kingdom Arena pitch, SIS Pitches, has shared its ambitious long-term plans to expand into Saudi Arabia and the Middle East.
There is now less than one month to go until the 2018 World Football Cup finals in Russia!
With the schedule set, tickets purchased and squads finalised, we take a look at some of the high-tech stadia set to dazzle the world stage this summer.
SIS Pitches has been selected to design, construct and install SIS Grass Hybrid technology at 6 of the 12 venues to be used during this year’s finals! This includes the Luzhniki stadium, which will host the opening and final games of the tournament- making the 2018 World Football Cup the first to have the final contested on anything but a natural grass surface.
In total, 30 of the 32 nations taking part in this year’s showpiece will take to SIS Grass Hybrid during the group stages. Only Sweden and Egypt will have to progress to the knockout stages to have a chance of playing on the surface in the tournament.
3 of the 6 stadiums with SIS Grass Hybrid have also been fitted with SIS Air, our innovative system designed specifically to proactively manage moisture content of soil and then remove excess water from the soil profile.
George Mullan, CEO of SIS Pitches, believes this year’s finals are set to be extra special:
“It was an absolute honour to have been chosen to not only design, construct and install the pitch at the Luzhniki Stadium but at six of the 12 World Football Cup venues – working on more pitches than any other company.”
“It’s the first time a World Football Cup Final has been played on anything but all-natural grass. SIS Grass Hybrid was only launched in 2015 and already it has been installed at a number of world-class stadiums and now the 2018 World Football Cup Final will be played on it. The quality of SIS Grass will ensure that the pitches are resilient in all conditions, and I am sure the 2018 World Football Cup finals will be one that we will always remember.”
Here, we take a closer look at our super six stadiums!
Capacity: 81,000
Games held here: Opening game and 3 x further group games, 1 x Round of 16, 1 x Semi Final, Final
Features: SIS Grass Hybrid and SIS Air
Fun Fact: Before redevelopment, Manchester United and Chelsea contested the 2008 Champions League Final here.
Capacity: 45,000
Club team based here: Spartak Moscow
Games held here: 4 x group games, 1 x Round of 16
Features: SIS Grass Hybrid and SIS Air
Fun Fact: The Okritie Arena will host Lionel Messi’s Argentina in their opening group game.
Capacity: 45,000
Games held here: 4 x group games, 1 x Round of 16
Features: SIS Grass Hybrid and SIS Air
Fun Fact: The stadium is situated on the left bank of the Don river.
Capacity: 35,000
Games held here: 4 x group games
Features: SIS Grass Hybrid
Club team based here: FC Baltika Kaliningrad
Fun Fact: The stadium is built on Oktyabrsky Island and is the furthest West of all World Football Cup venues.
Capacity: 45,000
Games held here: 4 x group games, 1 x Round of 16, 1 x Quarter Final
Features: SIS Grass Hybrid
Fun Fact: The shape of the stadium represents a glass dome.
Capacity: 45,000
Games held here: 4 x group games
Features: SIS Grass Hybrid
Fun Fact: Post World Football Cup, the stadium is to house indoor volleyball, basketball and tennis courts.
Who will star on SISGrass this summer? We haven’t long to find out!
If you’re looking for an expert in sport pitch installation, maintenance and resurfacing, SISPitches can help. We have years of experience, installing and maintaining some of the world’s most famous pitches. Arrange your free consultation today.