The facilities consist of two seeded based natural pitches, 1 roll grass based natural pitch and 1 synthetic pitch.
Due to the tough weather conditions, with temperatures as low as -30 degrees and the hi-usage of the training grounds, the infrastructure of the pitches included a heating system to make sure the pitches are always in good condition. The installation of the infrastructure was executed to an incredibly hi-standard to best serve the sustainability of the pitches.
An approximately 32,000 square meter project will be handed over on 20th September.
Enjoy This Post?
Sign up for regular updates direct to your inbox