After researching where best to build the new pitch, it was decided to locate the new Baku Olympic Stadium Natural Training Pitch within the existing stadium’s carpark.
The pitch was constructed on tarmac and raised on average 40cm, with a retaining wall of tarmac because of the existing infrastructure lines and water table issues. Insulation from the water table has been created with a membrane cover and the pitch was layed with 20mm turf to get ready for the U17UEFA Championship Training during May.
Now the Baku Olympic Stadium Complex is becoming the face of Azerbaijan’s Football and Sport Facilities – including athletics and all related sports for the future.
Enjoy This Post?
Sign up for regular updates direct to your inbox