kid kicking a football at independant school

SIS Pitches upgrade more 3G pitches for the community

The Client

The 3g pitch project was carried out for a school under a framework agreement that supports the capital investment programmes of the Rugby Football Union (RFU), Football Association (FA), Sport England, England Hockey, and Football Foundation (FF).

THE BACKGROUND

The school required a complete upgrade of its existing artificial pitch to meet the latest football and rugby training standards. The aim was to create a modern facility that could be used by both the school and the local community while adhering to the framework’s design, manufacture, installation, and maintenance requirements.

THE BRIEF

The project involved removing and replacing the old pitch system, expanding the facility, and installing additional features to enhance usability for football and rugby. The project must be completed on time and within budget to ensure availability for the new school term.

WHAT WE DID

SIS Pitches carried out the following works:

  • Removed the existing carpet, shock pad, and fencing.
  • Extended the width of the pitch and installed a new collector drain and perimeter kerbs.
  • Installed a new in-situ shock pad and a 3G surface suitable for football and rugby training.
  • Added new twin-bar fencing, sports equipment, and a new mowing strip.
  • Refurbished the existing floodlighting.

The transformation replaced the old sand-filled system with the latest 3G pitch system suitable for both sports.

THE OUTCOME

The project was completed on time and within budget, delivering a facility that benefits the school and the local community. Bill Toth, Business Manager at the school, shared his satisfaction:

We have been very impressed with SIS’s professionalism and ability to deliver the AGP project to a very tight schedule. From the start to the end of the programme, a’ can-do’ attitude showed them to be a top-quality company to work with. We have opened the facility up to the local community, and many local clubs are now enjoying what is one of the best facilities in the area – our thanks to SIS, who were an absolute pleasure to work with. We would not hesitate to recommend SIS to other schools and organisations in the future.

Bill Toth, Business Manager

Share:

Free Consultation

Looking for construction or maintenance of your synthetic, hybrid or natural sports surface? Get in touch with our experts for a free consultation.

Contact Us

Case Studies

warwick school 3g rugby pitch

SIS Pitches installs 2 excellent facilities for Warwick and King’s High School

Sporting facilities installed at Warwick School and King’s High School, part of the Warwick Independent Schools Foundation

Read more
Loughborough university 3g rugby pitch

Loughborough University unveil new 3G rugby pitch

Loughborough University aimed to upgrade their rugby pitch with a synthetic surface to improve playing conditions, and playing time.

Read more
hampton school synthetic tennis courts

Resurface of Hampton School 3G pitch and tennis courts

SIS Pitches are pleased to hand-over a new 3G pitch and 5 tennis courts.

Read more